View Single Post
Old 19th June 2008, 03:16 AM   #24 (permalink)
plumwerks
GTR Register Member
 
Join Date: Dec 2006
Location: Montreal, Canada
Posts: 331
I was referring to the gradual method,at least for the first 500 or 600 miles,then gradually start to do the quick bursts and back off to get the oil to wash down the bores.
Oh and get the pulleys already,they wont slip,good ones actually have teeth to align them,if your builder is as thorough as you say,them I'm sure he will ask for them.
plumwerks is offline   Reply With Quote