heres one we have put together this week for Kris
as well as a full pearl wrap with matching lowers we also tinted the windows - arranged wheel re finish and tinted both rear lights and side markers
on arrival
stripped and made ready
out with the fablon
and complete
all work took place over one week
thanks for looking
Paul
as well as a full pearl wrap with matching lowers we also tinted the windows - arranged wheel re finish and tinted both rear lights and side markers
on arrival


stripped and made ready


out with the fablon























and complete













all work took place over one week
thanks for looking
Paul